FAQ: Cascading Date Rules
When an individual seeks to cascade an action to another user, by design the system bounds all downstream actions but it’s upstream timeframe.
For example, if Action 1 is Jan 1, 2019 to Sept 1, 2019, the downstream action (Action 1.1) MUST fit within this timeframe. If Action 1.1 further narrows the timeframe, then Action 1.1.1 must fit within the timeframe of Action 1.1